    Ballast Water Management

    Ballast Water Management

    1. The Importance of Ballast Water Management

    Around the world approximately 3 to 5 billion tons of ballast water is transferred via ships each year, introducing aquatic invasive species into new environment, posing serious threats to maritime ecosystems, aquatic economy and human health.
    The transfer of ballast water cannot be avoided since ballast water is absolutely essential to the safe and efficient operation of modern shipping. But the transportation of non-native species can be eliminated by means of appropriate treatment of ballast water.
    The International Maritime Organization (IMO) has adapted the International Convention for the Control and Management of Ship’s Ballast Water and Sediments, 2004, which mandates all ships that carry ballast water install treatment system by the required year depending on their ballast tank capacity and the year being built.

    2. Ballast Water Management Technical Specifications

    Model

    Maximum Ballast water treatment

    Capacity (m3/h)

    Flow Rate to Electrolyze

    (m3/h)

    Required Power

    (AC KVA)

    EDU

    BC-150

    170

    4.2~7.2

    4.46~8.29

    2300 x 1400 x 1920

    BC-300

    350

    4.2~7.2

    9.19~17.06

    2300 x 1400 x 1920

    BC-500

    600

    4.2~7.2

    15.75~29.25

    2300 x 1400 x 1920

    BC-1000

    1200

    7~12

    31.50~58.50

    2300 x 1400 x 2015

    BC-1500

    1700

    11.2~19.2

    44.63~82.88

    2300 x 1400 x 2015

    BC-2000

    2200

    11.2~19.2

    57.75~107.25

    2300 x 1700 x 2015

    BC-2500

    2800

    22.4~36

    73.50~136.50

    2800 x 1800 x 2625

    BC-3000

    3200

    22.4~36

    84.00~156.00

    2800 x 1800 x 2625

    BC-3500

    3800

    25.2~40

    99.75~185.25

    2800 x 1800 x 2625

    BC-4000

    4300

    25.2~40

    112.88~209.63

    2800 x 1800 x 2625

    BC-5000

    5500

    31.5~50

    144.38~268.13

    2800 x 2050 x 2625

    BC-6000

    6300

    50.4~80

    170.63~316.88

    3200 x 2200 x 2625

    BC-7000

    7300

    50.4~80

    196.88~365.63

    3200 x 2200 x 2625

    BC-8000

    8500

    50.4~80

    223.13~414.38

    3200 x 2200 x 2625

    3. Ballast Water Management Principle Introduction

    The treatment procedure includes three major parts: Filtration, Seawater Electro-chlorination for disinfection and Neutralization.
    (1) Filtration: during ballasting, total volume of ballast water flow through a 50um filtration unit, marine organism and particles larger than 50um are filtrated and discharged back to local water;
    (2) Seawater Electro-chlorination for disinfection: a small amount of filtrated sea water flows into electrolysis unit to generate high concentrated sodium hypochlorite solution, which will be injected back to main ballast pipe line after de-gas treatment. Sodium Hypochlorite solution will be mixed with the sea water form main ballast pipe line to a certain designed concentration, which is able to kill the marine organism including spores, lavas and pathogen within the water, in order to meet the disinfection standard (D-2 Standard and the others). The concentration of active agent in main pipe line is monitored and controlled through TRO unit and system main control unit.
    (3) Neutralization: during vessel de-ballasting, when the residual chlorine concentration is lower than IMO requirement, Neutralization Unit will not be operating; If the residual chlorine concentration is higher than the requirement, Neutralization Unit is automatically dosing Neutralization agent in water stream. The dosing concentration is monitored and controlled automatically through TRO Unit and System Control Unit.


    4. Ballast Water Management Several Class Certificates Supply:

    ABS, BV, DNV, GL, KR, RINA, NK, USCG and CCS class certificates.